I did consider that round hatch, but I had put the Photo-etched part there and didn't want to spoil that work.
It doesn't look very prototypical when opened, I was actually surprised at the thickness of the plastic here (around 2.5mm), the access hatch looks like it's made of six inch thick steel!!!
With you 100,%, saw Bob's products, the electronic starter is a great idea.
BUT
As I mentioned earlier, the cost of postage and tax from the USA will put the product at around 60 plus Euro, which I can't justify for this build given the Sub kit itself cost 65 Euro. Also, I prefer mechanical On/Off switches as the boat is complete, you don't need any additional items other than the TX to operate. Here's the set up disguised on my last build.
I prefer to think of the Sub as coming with a working forward hatch!
The volume of the WTC with the water is now 3300ml minus 600ml, so 2700ml of space and pushing in 500ml of air is still around the 18% mark, beyond 25% there might be some issues alright.
Here is the final arrangement, at the shaft end, the stuffing tube is filled with silicone grease and has a greased mini O ring at both ends that are compressed slightly so that the shaft still rotates. It a matter of getting the balance between enough compression of the mini O rings to keep the pressure in the tank and little enough so the shaft turns easily.
The forward end has the valve sealed with a box of styrene filled with two-part epoxy, that solved the tiny leak. The square of velcro acts as a bump pad against the forward caswell fittings in the top hull where the WTC rests.
The WTC now holds pressure with 750ml of air through the valve (50% more than the 500ml that the Piston Tank will disperse), so a good margin of safety.
Well pleased that it works, even though the inner WTC O rings are not required (note for the next build), on to the servos etc. which I have now ordered.
I found a nice stainless dust cap with an internal O ring that will be a bit of insurance if the valve fails.
The bicycle pump pushes 78ml of air per stroke, so seven strokes is over the 500ml of the piston tank (I know it's not exact as the air will compress, where the water in the piston tank will not).
Here is the WTC under water with seven pump strokes, the stuffing tube only has a small O ring tight up against the shaft, but still lets the shaft rotate. But this is where it gets a bit weird!
Tests with inner and outer O rings in place showed some small leaks around the rim. So to remedy this, I decided to start with the outer O rings only and fix these first. However, with just the outer O rings, there are no leaks (except a tiny leak around the outside of the stuffing tube, more epoxy).
So it looks like I don't need the inner O rings at all..................... have to do some more tests!!!!!