I'll need to get the 1/48th scale hull and plans from Mike before determining exact size of tubing needed for launch-tubes and torpedos. Fit of torpedo inside launch tube is critical and tubes need to fit scale openings in hull.
Maybe 10 days or so? I think Mike is still working on the drawings. At least I hope he is? :)
The gas recharging and activation valving system, at high pressure, would be too difficult to make at that small a scale, I think, but I suppose it could be done.
Maybe 10 days or so? I think Mike is still working on the drawings. At least I hope he is? :)
The gas recharging and activation valving system, at high pressure, would be too difficult to make at that small a scale, I think, but I suppose it could be done.
Comment