Welcome to our forums. For the best in R/C submarine kits, components and accessories, be sure to visit the Nautilus Drydocks
If this is your first visit, be sure to
check out the FAQ by clicking the
link above. You may have to register
before you can post: click the register link above to proceed. To start viewing messages,
select the forum that you want to visit from the selection below.
Tom, yeah it's the trumpeters kit, had it laying around in the stash, must be at least a decade or so.
The intension is a kind of recruiting boat, to infect more people to join the tribe.
Working on the floodholes and some other stuff.
I am not a big Kilo fan, but your idea as an introduction for unsuspecting and vulnerable children is brilliant! Much like how David does it or how I got hooked back into this hobby.
If you can cut, drill, saw, hit things and swear a lot, you're well on the way to building a working model sub.
I am not a big Kilo fan, but your idea as an introduction for unsuspecting and vulnerable children is brilliant! Much like how David does it or how I got hooked back into this hobby.
The Kilo is a bit small for my taste, but ideal to hook up interested people, especially during poolruns, due to the size it's a nice boat to keep your skills sharp, i' ve got me the XXI for more victims.
Made some studs near the middle part of the hull to get it less flexing at that point.
A dryfitt of both hull parts, for now it seems to be looking good, next step will be, replacing the plastick railing by 1 mm copper, those plastick rails is asking for trouble, even by looking at them they will break.
Railings are done, next step, building the scope and antenna stuf, unfortunally i don't have the kit to build one, but i do have enough pictures to start up the lathe to get me some.
This set of railings is included in the kit itself, unpractical to handle since they are plastick and so prone to break, but they do offer a nice mold to reproduce them in copper.
The two small one's didn't give any problems, made a template from tape and secured everything to be soldered in one try.
The other side with the long railing, ended up using 1 mm as studs and the railing itself from 0,5 mm copper rod.
Next step will be, opening the front windows and make all the stuf needed on top, i allready have some small diameter stainless steel tubing in the stash, just have to turn the top-ends on the lathe.
Comment