I've started the GATO build with Davids sub driver and DVDs. I'm hung up on the aft section build so I sent David an email. He advised I share my stupidity with the group. I've been building RC aircraft for decades and know that there is a point on some builds you better have all your control rods in place before you cover everything up. I'm trying to figure out how just gluing the skeg on with rtv does you any good as you will never be able to get to the control links in the hull. Unless you gain access through the stern tube holes? I swear I saw David glue the lower rudder bearing in place, so I did the same. But even if the lower bearing was loose, you could never get to the bell-crank above it... Can anyone explain the secret to me?
Thanks,
Jay
Thanks,
Jay
Comment