Two development tests done 86 days apart.
The electric torpedo needs to be modified as per where I left off with the thread. Mainly longer run times and ease of production.
The gas torpedo is a different animal. Fun, easy to load and charge. much more practical to produce. Lots of benefits to the design.
The electric torpedo needs to be modified as per where I left off with the thread. Mainly longer run times and ease of production.
The gas torpedo is a different animal. Fun, easy to load and charge. much more practical to produce. Lots of benefits to the design.
Comment