Welcome to our forums. For the best in R/C submarine kits, components and accessories, be sure to visit the Nautilus Drydocks
If this is your first visit, be sure to
check out the FAQ by clicking the
link above. You may have to register
before you can post: click the register link above to proceed. To start viewing messages,
select the forum that you want to visit from the selection below.
There is not that much room to get a gearbox inside, so it will be logical to follow what David did, still working on other things before a can make a fit with the SD.
Question for David, if i decide to run them in the wet, are there certain things to do after a wet run, i would think lubricate them with WD 40 and make a dryrun to get the WD 40 all over.
Manfred, about 20 years ago I thought it was bonkers, but we got some RC car and truck people involved with tanks, and they always break-in their motors individually inside a glass on water. The main purpose is to wear-in the brushes, which provides a more stable voltage output, and it cuts down on arcing/ sparking which effects radio reception. Dave told me after running his that the motors run much better and this stands to reason.
No, i want to do that the old fashion way with some hidden screws underneath the deck, not really a fan of using just magnets to keep the conningtower at his place, a XXI without the conningtower after patrol is not what i'm looking for.
Thanks for the tips guys, first i will follow the route David went, if needed i can try plan B, first have to get at the stage of rebuilding the SD for my needs, don't know if there will be enough space left for realising plan B
Finished up the magnetic coupling of the rearpart and done some work on the conningtower,
It should work like this, using the pins as a guide and the magnets to keep it at its place
Removed the copper layer at the backside in preparations for glueing
First part being glued to the rearpart.
Used foil to prefent glueing the rearpart to the hull.
Lined it up with the hull and glued all parts together.
While the glue was drying started to work on the conningtower, made both scopes, navigation scope at the front and the attackscope at the back, and a hohentwiel radar antenna.
Still have to make the splitterscreens and some more antenna's, have to alter the schnorkelhead because it's too big accourding to my drawings.
This is the result of the magnetic coupler, the rear-end is connected to the hull
By pulling it apart you can access the internals of the rearpart, had to make some slits on the hull coupling since the shafts will stay inside the rearpart.
There is not that much room to get a gearbox inside, so it will be logical to follow what David did, still working on other things before a can make a fit with the SD.
Question for David, if i decide to run them in the wet, are there certain things to do after a wet run, i would think lubricate them with WD 40 and make a dryrun to get the WD 40 all over.
Nope. Put 'em away wet and they'll be good for a season. When they go tits up, replace 'em. I got hundreds of 'em. Cheap as dirt too.
There is not that much room to get a gearbox inside, so it will be logical to follow what David did, still working on other things before a can make a fit with the SD.
Question for David, if i decide to run them in the wet, are there certain things to do after a wet run, i would think lubricate them with WD 40 and make a dryrun to get the WD 40 all over.
Manfred, you are presenting a level of work that is always on the level of a fine watchmaker. Here's some input into it's operation as I drove the one Dave built. I was skeptical as to how it was going to operate, but it operates surprisingly well for such a small package, and the external forces on the planing surfaces are not that great, so you can get away with a lot.
Ah, i can see it now, used the bowplanes mistakely for the stern, since they are pressfitted i can change them to the way it's suppost to be, thanks for the tip guys
Leave a comment: