I finished the linkages at the rear.
The wiring for the top rudder light comes down the crank and up out of the way of the prop shaft..........
.............which is once again a 4mm brass rod with 2.5mm dogbone to go in Dave's fitting on the prop shaft, I had ordered a 4mm stainless shaft and cardan coupling but forgot there's no room down there.
Thanks to Dave's generosity, it was a doddle to sort.
The rear is now all sorted.................
..................... on to the bulkheads next.
The wiring for the top rudder light comes down the crank and up out of the way of the prop shaft..........
.............which is once again a 4mm brass rod with 2.5mm dogbone to go in Dave's fitting on the prop shaft, I had ordered a 4mm stainless shaft and cardan coupling but forgot there's no room down there.
Thanks to Dave's generosity, it was a doddle to sort.
The rear is now all sorted.................
..................... on to the bulkheads next.
Comment