Oscar

Collapse
X
 
  • Time
  • Show
Clear All
new posts

  • Hazegry
    replied
    I don't think so and if it does its easy enough to block them off back inside the hull so its not easily seen.

    Leave a comment:


  • redboat219
    replied
    Would leaving all the doors open even if you're only going to make 2 fire cause problems, like drag or dynamic problems?

    Leave a comment:


  • Hazegry
    replied
    yeah I will have to look at doing only one or two tubes. I will open all the doors though.

    Leave a comment:


  • redboat219
    replied
    That's my plan with my Revell Type VII after I finish my Kilo. Just get one tube working to show off.

    Leave a comment:


  • He Who Shall Not Be Named
    replied
    Start with only one, maybe two tubes. Cheaper that way. You want to get crazy later, opt for more launchers.

    M

    Leave a comment:


  • He Who Shall Not Be Named
    replied
    Start with only one, maybe two tubes. Cheaper that way. You want to get crazy later, opt for more launchers.

    M

    Leave a comment:


  • Hazegry
    replied
    Well after looking at several theeads and builds I think i will do a skipjack with torpedo tubes

    Leave a comment:


  • Albion
    replied
    Originally posted by He Who Shall Not Be Named
    Why, no, no it's not Romel's first sub. He has a yet to be finished 1/144 KILO.
    I know, i was just stirring it up
    Not that i can talk, ive got three builds on right now, and was stalled on all three. finally getting traction on the M1 though

    Leave a comment:


  • He Who Shall Not Be Named
    replied
    Always behind you ... ready to shove.

    M

    Leave a comment:


  • He Who Shall Not Be Named
    replied
    Always behind you ... ready to shove.

    M

    Leave a comment:


  • redboat219
    replied
    Originally posted by Subculture
    Perhaps he's got stuck. Have you?

    If you need help with something, ask.
    No, I haven't gotten stuck.
    It's just that different priorities popped up the last couple of years that has put my build on hold.

    Thanks for the offer.

    Leave a comment:


  • Subculture
    replied
    Perhaps he's got stuck. Have you?

    If you need help with something, ask.

    Leave a comment:


  • He Who Shall Not Be Named
    replied
    Originally posted by Albion
    That's fair enough, but not your first sub right?
    Why, no, no it's not Romel's first sub. He has a yet to be finished 1/144 KILO.

    How's the KILO going, pal? When are you going to put something into the water. You've been a Bride's-Maid long enough.

    M

    Leave a comment:


  • He Who Shall Not Be Named
    replied
    Originally posted by Albion
    That's fair enough, but not your first sub right?
    Why, no, no it's not Romel's first sub. He has a yet to be finished 1/144 KILO.

    How's the KILO going, pal? When are you going to put something into the water. You've been a Bride's-Maid long enough.

    M

    Leave a comment:


  • Albion
    replied
    Originally posted by redboat219
    Got the 23 because the Skipjack ( both Revell and Moebius) was more expensive...
    That's fair enough, but not your first sub right?

    Leave a comment:

Working...