welded the bow and stern onto the hull. Exciting to see her come together! I am a proud owner of a WTC from D&E. So, I was able to remove the cross braces moving my total weight off the top to 179.6 g or 6.3352 oz! and get it to drop in. Where do I know to place it in the sub? Is there a distance or measurement for placement?
Moving back to deck construction, now that I knew what cross members I would not have, I place the deck on the hull and checked fit. It did not bow down and held its shape. I still will add a reinforcement of some type - working on ideas for that.
So time to add the front vent plates. Before I could glue them, I needed to remove the forward portion of the pin receptacles. I want to be able to slide the deck forward and have several areas engage to hold the deck down. So I drilled, cut, shaped, trimmed, and tested the cutouts to the corresponding pins until with a small amount of resistance it slid in.
A closer look
Now is the time to use cohesive on the part to commit my idea.
I had to be creative here to get the fit I wanted. So using toothpicks as little leverages, I adjusted the fit of the side to the deck. Some toothpicks were placed to move the top of the vent outward.
and others were to lift the piece just enough.
Now came the test to see if it would work. My first couple of tugs the deck did not slide. GRRRRR! I took a deep breath and rather than rip it apart, I gently tried again....it came apart just the way it was supposed to! After a brief dance around the room (definitely no photos of that), I went ahead and added some side reinforcement.
Reattached the top to make sure it works the way it should and it did again. There is a click when it engages. Not sure if I need to open the sides a little more or leave it and give it time to either grow on me or push me to fix.
I am pleased with the results. There is a gap at the bow, but I can fill that and narrow the space.
Now to mounting the wtc and dive controls and propellor.
Leave a comment: